Decision details

Detailed Planning Permission for the erection of 30 affordable residential units with associated infrastructure and open space - former Braeside Primary School

Decision Maker: Planning Development Management Committee, Planning Development Management Committee (Visits)

Is Key decision?: No

Is subject to call in?: No

Decision:

Application approved conditionally subject to legal agreement, and conditions 10 and 12 amended to read:-

 

(10) CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN

 

No development shall take place unless a site-specific Construction Environmental Management Plan(s) (the “CEMP”) has been submitted to and approved in writing by the Planning Authority. The CEMP must address the following issues (i) surface water management including construction phase SUDS; and (ii) construction site traffic access and egress arrangements; and (iii) management of dust. Thereafter, unless otherwise agreed in writing with the planning authority, development shall be undertaken in accordance with the approved CEMP.

 

Reason – to minimise the impacts of necessary demolition / construction works on the environment.

 

(12) DRAINAGE

 

No development shall take place unless details of the connection point between the site surface water sewer system and the public sewer system has been submitted to and approved in writing by the planning authority. The details shall include confirmation that Scottish Water accept the proposed new connection. Otherwise, unless otherwise agreed in writing with the planning authority, no unit shall be occupied unless all drainage works detailed in the approved Drainage Assessment (146472 DA01 (Rev.7) and drawing 146472/2200 (Rev.F) produced by Fairhurst (or such other drawing approved for the purpose) have been installed in accordance with the approved details and is available for use.

 

Reason – to safeguard water quality, prevent flooding and ensure that the proposed development can be adequately drained.

 

 

Publication date: 13/06/2023

Date of decision: 08/06/2023

Decided at meeting: 08/06/2023 - Planning Development Management Committee (Visits)

Accompanying Documents: