Agenda item

Hopetoun Grange, Land to North of Bucksburn - P130029

Minutes:

With reference to article 5 of the minute of meeting of the Development Management Sub Committee of 22 August, 2013, wherein the Sub Committee agreed to visit the site, the Sub Committee had before it a report by the Head of Planning and Sustainable Development which recommended:-

a willingness to approve, subject to conditions (as detailed below) but to withhold the issue of the consent document until the applicant has entered into a legal agreement with the Council to secure the identified developer contributions towards primary education, community facilities, recreation, core path networks and the Strategic Transport Fund for a proposed development of 65 residential houses, including infrastructure and landscaping at Hopetoun Grange (land to the north of), Bucksburn, Aberdeen, subject to the following conditions:-

(1)  That the Dollar flatted properties proposed as part of the residential units of the development hereby approved shall not be occupied unless acoustically attenuated ventilators have been installed within the lounge accommodation of these aforementioned properties.  (2)  That no development pursuant to this planning permission shall take place unless there has been submitted to and approved in writing for the purpose by the planning authority, report on three days of noise measurements, to be undertaken at a representative location in the vicinity of the development.  These measurements should be weekday LAeq 1 hour or 15 minute readings and calculated to obtain 18 hour LAeq (23:00 - 07:00).  Whilst these measurements may be unmanned, short term measurements when helicopters are in flight overhead should also be taken.  If the noise measurement assessment report demonstrates the need for noise attenuation to be incorporated into the fabric of the residential units of the development hereby approved, then such attenuation measures as may be recommended by the planning authority shall be implemented in full prior to occupation of any residential unit.  (3)  That the SUDS basin is constructed as per the detail included in the Drainage Assessment Issue 1 by Fairhurst dated 4 July 2013, and is capable of retaining flows up to and including the 1 in 200 year store event plus climate change.  (4)  That the discharge rate, as outlined in the Drainage Assessment Issue 1 by Fairhurst dated 4 July 2013, does not exceed the greenfield flows as per the design calculations.  (5)  That no development shall take place unless there has been submitted to and agreed in writing by the planning authority detailed plans showing the visibility splays for all new road junctions, including for the 3 no. driveways accessing onto Hopetoun Grange, and thereafter the junctions shall be constructed in full accordance with the approved plans.  (6)  That the development hereby granted planning permission shall not be occupied unless the lane to the west of the site between the A96 and the point that it interacts with what will become the spine road to the future development to the west is upgraded to an adoptable standard for pedestrians and cyclists.  Notwithstanding that the phasing of construction on site may impact on when safe access and use of the path by pedestrians may be available, details of the proposed upgrading work to the path must nevertheless be submitted to and approved by the planning authority, and the upgrading work must be completed prior to any residential unit being occupied.  (7)  That the development hereby granted planning permission shall be completed in full accordance with Drawing No DL002 Rev H which demonstrates the provision of a service strip between the street and residential dwellings along the proposed shared surface road, and that no future development takes place within the aforementioned service strip.  (8)  That no part of the development hereby approved shall be occupied unless a schedule of work relating to upgrading of bus shelters, seating, lighting, timetable information and boarding kerbs for bus stops on the A96 and on Sclattie Park identified in the Transport Statement (Issue 2 Rev 3 by Fairhurst) has been submitted to and approved by the planning authority, and subsequently the upgrading work has been implemented prior to the occupancy of any residential unit implemented.  (9)  That no development pursuant to this planning permission shall take place unless formal approval has been secured for access under the trunk road (A96) and under a section of 3rd party land lying immediately to the east of the site to provide connection to the proposed surface water drainage and public sewer.  (10)  That no development pursuant to this planning permission shall take place, nor shall any part of the development hereby approved be occupied, unless there has been submitted to and approved in writing by the planning authority, a detailed scheme of site and plot boundary enclosures for the entire development hereby granted planning permission, which scheme shall include no boundary enclosure above a maximum height of 1 metre being permitted to the front of any residential unit within the development hereby approved.  None of the buildings hereby granted planning permission shall be occupied unless the said scheme has been implemented in its entirety.  (11)  That no development pursuant to the planning permission hereby approved shall be carried out unless there has been submitted to and approved in writing for the purpose by the planning authority a further detailed scheme of landscaping for the site, which scheme shall include both soft and water landscaping, indications of all existing trees and landscaped areas on the land and details of any to be retained, together with measures for their protection in the course of development, and shall also clearly identify the locations where root barrier protection shall be implemented.  The scheme shall include the proposed areas of trees/shrub planting including details of numbers, densities, locations, species, sizes and stage of maturity at planting, with all replacement planting on site undertaken on the basis of 2 for 1 for every tree removed.  Such landscaping scheme shall include a high percentage of native species both in terms of the proposed trees (eg Sessile oak, Scots pine, Field maple and aspen) and the hedgerows, whilst also taking into account that the choice of species should discourage bird activity (feeding/roosting) which may present a bird strike threat to aircraft operating at Aberdeen International Airport.  (12)  That all planting, seeding and turfing comprised in the approved scheme of landscaping shall be carried out in the first planting season following the completion of the development and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a size and species similar to those originally required to be planted, or in accordance with such other scheme as may be submitted to and approved in writing for the purpose by the planning authority.  (13)  That no development shall take place unless a plan showing those trees to be removed and those to be retained and a scheme for the protection of all trees to be retained on the site during construction works has been submitted to, and approved in writing by, the planning authority and any such scheme as may have been approved has been implemented.  (14)  That any tree work which appears to become necessary during the implementation of the development shall not be undertaken without the prior written consent of the planning authority; any damage caused to trees growing on the site shall be remedied in accordance with British Standard 3998: 2010 "Recommendations for Tree Work" before the building hereby approved is first occupied.  (15)  That no materials, supplies, plant, machinery, spoil, changes in ground levels or construction activities shall be permitted within the protected areas specified in the aforementioned scheme of tree protection without the written consent of the planning authority and no fire shall be lit in a position where the flames could extend to within 5 metres of foliage, branches or trunks.  (16)  That no development shall take place within the application site until the applicant has secured the implementation of a programme of archaeological work which shall include post-excavation and publication work in accordance with a written scheme of investigation which has been submitted by the applicant and approved by the planning authority.  (17)  That no construction work pursuant to the planning permission hereby approved shall be undertaken by cranage or scaffolding of a height greater than 8.2 metres above ground level without prior consultation and approval of Aberdeen International Airport.  (18)  That no development pursuant to the planning permission hereby approved shall take place until a bird hazard management plan has been submitted to and approved in writing by the planning authority.  The submitted plan shall include details of the developer's commitment to managing the risk of attracting birds to the site during excavation activities, and the measures in place for the safe dispersal of birds and thereafter the agreed measures shall be implemented in full.  (19)  That no development shall take place unless details of all measures for deterring birds from the proposed Sustainable Urban Drainage System scheme have been submitted to and approved in writing by the planning authority.  Such details shall outline the measures being put in place to avoid endangering the safe operation of aircraft through the attraction of birds and thereafter such measures should be implemented in complete accordance with the approved details.  (20)  That there shall be no means of direct vehicular access from the application site to the trunk road (A96).  Pedestrian access to the trunk road shall be restricted to the footpath immediately to the west of the site.  (21)  That the applicant shall liaise with Transport Scotland and its Operating Company in regard to the timing, traffic management and standard of construction required for the pipeline crossing under the trunk road (A96).  (22)  That no development pursuant to the planning permission hereby approved shall take place unless detailed plans showing lighting schemes required during construction and for the completed development are submitted and approved in writing by the planning authority.  Such lighting schemes shall incorporate flat glass, full cut off design with horizontal mountings, and shall ensure that no light spill occurs above the horizontal.  (23)  That no development shall take place unless a scheme detailing compliance with the Council's 'Low and Zero Carbon Buildings' supplementary guidance has been submitted to and approved in writing by the planning authority, and any recommended measures specified within that scheme for the reduction of carbon emissions have been implemented in full.  Thereafter no building shall be occupied unless the recommended measures specified within that scheme for the reduction of carbon emissions have been implemented in full.  (24)  That no development pursuant to this development shall take place unless further detailed specification has been submitted to and approved in writing by the planning authority clearly demonstrating that the load-bearing capacity of the proposed combined cycleway/footpath is capable for use by emergency service vehicles.  (25)  That no development pursuant to the planning permission hereby approved shall be carried out unless a method statement for the use of no-dig road and path construction within the root protection areas of retained trees has been submitted to and approved in writing for the purpose by the planning authority.  (26)  That no development pursuant to the planning permission hereby approved shall be carried out unless drawings showing specific finished ground levels, finished road levels, and finished ground floor levels of dwellings across the site have been submitted and approved in writing for the purpose by the planning authority.

 

The Sub Committee members were addressed by the planning officers as well as the roads officer and environmental health officer, following which the members asked detailed questions relating to the application to the officers in attendance.  The officers in attendance also provided clarity on a number of issues relating to the boundary wall and the trees in the application (including examining the detailed plans for the application).

 

The Sub Committee resolved:-

That the application be deferred pending discussion with the applicant as to the re-design of the site layout to retain the boundary wall and as many trees as possible utilising a single access point which meets safety requirements based on the conditions contained in the report.

Supporting documents: