Agenda item

Draft Housing Revenue Account (HRA) Budget and Housing Capital Budget 2014/15 to 2018/19 - CG/13/117

Minutes:

With reference to Article 15 of the minute of meeting of the Finance, Policy and Resources Committee of 5 December 2013, the Council had before it a joint report by the Director of Corporate Governance and the Director of Housing and Environment which provided members with information to allow the setting of the rent level for the financial year 2014/15 as well as the provisional rent levels for the financial years 2015/16 to 2018/19, explaining that this would allow a capital programme for 2014/15 to be set as well as a provisional programme for 2015/16 to 2018/19.

 

The report recommended:-

that the Finance, Policy and Resources Committee consider the draft HRA Budget and refer it to Council on 18 December 2013 to:-

(a)          approve the budget as attached as appendix 1 to the report;

(b)          approve the weekly unrebated rents for municipal houses, as detailed in appendix 1 to the report, to take effect from Monday 7 April 2014;

(c)          approve the level of revenue contribution to the Housing Capital budget for 2014/15 as well as a provisional contribution for the subsequent four financial years as detailed in appendix 1 to the report;

(d)          continue to increase the level of working balances to 10% to meet future contingencies;

(e)          agree the continuation of the practice that all capital receipts, from the disposal of Council houses under the right to buy, continue to be used to repay debt for 2014/15 and future years;

(f)            approve the level of miscellaneous rents and service charges, including Heat with Rent as detailed in appendix 1 to the report;

(g)          set a capital programme for the financial year 2014/15 based on the rent strategy adopted as well as the indicative level of programme for the financial years 2015/16 to 2018/19;

(h)          in order for work to commence on the capital programme, approve as estimated expenditure in terms of Standing Order 1(3) (of the Council’s Standing Orders relating to Contracts and Procurement) the sums shown against each heading of the Housing Capital budget set out in appendix 1 to the report; and

(i)            authorise the Director of Housing and Environment to undertake or instruct appropriate procedures to procure the work referred to in appendix 1 for the capital programme and award contracts thereto.

 

The Finance, Policy and Resources Committee had referred the report simpliciter to Council.

 

Councillor Cooney moved, seconded by Councillor Thomson:-

            That the Council -

(1)      approve the budget as amended by the following proposals;

(2)      set the weekly unrebated rents to increase by 3.5% from Monday 7 April 2014;

(3)      approve the capital expenditure funded by current revenue contribution of £21,924,000; and

(4)      approve recommendations (d) to (i) as contained within the report.

 

 

 

Housing Revenue Account

 

 

 

 

Draft 2014/15 Budget

Budget

Out-turn

Budget

 

 

2013/14

2013/14

2014/15

 

 

 

 

3.5%

 

 

£000's

£000's

£000's

 

 

 

 

 

 

Premises Costs

 

 

 

1

Rates

3

19

19

2

Rent – Other

138

138

141

3

Repairs and Maintenance

22,042

22,042

22,407

4

Maintenance of Grounds

3,045

3,045

3,075

5

Gas

674

674

1,014

6

Electricity

2,420

2,420

2,512

7

Cleaning Service

542

500

495

8

Security Service

372

300

376

9

Window Cleaning

19

10

24

10

Refuse Collection

325

325

328

11

Cleaning – Sheltered Housing

453

504

499

12

Premises Insurance

57

57

57

13

Other Property Costs - Council Tax

122

201

201

 

 

30,212

30,235

31,148

 

 

 

 

 

 

Administration Costs

 

 

 

14

Downsizing Grants/Direct Debit Incentives

52

20

52

15

Legal Expenses

201

201

201

16

Office Tel / Rent

88

88

88

17

Former Tenants Arrears

1,379

1,800

2,000

18

Charges - Services Admin & Management.

8,582

8,096

8,657

19

General Consultancy

55

55

85

20

Training for Front Line Staff

100

100

100

21

Benefits Staff

95

95

141

22

Charges - Tenants Participation

206

206

208

23

Charges for Environmental Health

227

227

227

 

 

10,985

10,888

11,759

 

 

 

 

 

 

Supplies & Services

 

 

 

24

Provision of Meals

168

192

194

25

Equipment Purchase

55

0

0

26

Television Licence

5

4

5

27

Integrated Housing System

314

314

295

 

 

542

510

494

 

 

 

 

 

 

Agencies

 

 

 

28

Mediation Service

98

98

99

29

Energy Advice

81

81

82

30

Citizens Advice Bureau

14

14

14

31

Disabled Persons Housing Service

38

38

39

 

 

231

231

234

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Housing Revenue Account

Budget

Out-turn

Budget

 

Draft 2014/15 Budget

2013/14

2013/14

2014/15

 

 

£’000

£’000

£’000

 

 

 

 

3.5%

 

Transfer Payments

 

 

 

32

Aberdeen Families Project

414

414

418

33

Loss of Rent - Council Houses

722

1,157

900

34

Loss of Rent - Garages, Parking etc.

211

271

218

35

Loss of Rent - Modernisation Works

50

50

100

36

Supporting People Contribution

406

406

406

37

CFCR

22,034

22,175

21,924

 

 

23,837

24,473

23,966

 

 

 

 

 

 

Capital Financing Costs

 

 

 

38

Loans Fund Instalment

3,903

4,580

5,228

39

Loans Fund Interest

9,559

8,658

9,026

40

Heating Leasing Payment

131

100

0

 

 

13,593

13,338

14,254

 

 

 

 

 

 

Expense Total

79,400

79,675

81,855

 

 

 

 

 

 

Income

 

 

 

41

Government Grant - General

(234)

(234)

0

42

Ground Rentals

(27)

(27)

(27)

43

Dwelling Houses Rent Income

(76,220)

(76,584)

(79,017)

44

Housing - Heat with Rent Income

(1,649)

(1,649)

(1,649)

45

Housing - Garages Rent Income

(1,179)

(1,136)

(1,136)

46

Housing - Parking Spaces Rent

(192)

(180)

(180)

47

Housing - Insurance Income

(2)

(2)

(2)

48

Housing - Other Service Charge

(489)

(500)

(489)

49

Legal Expenses

(260)

(225)

(225)

50

Revenue Balance Interest

(148)

(138)

(130)

 

 

 

 

 

 

Income Total

(80,400)

(80,675)

(82,855)

 

 

 

 

 

 

Net Expenditure

(1,000)

(1,000)

(1,000)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Draft Housing Capital Budget 2014/15 to 2018/19

 

 

 

 

 

 

 

2014/15

2015/16

2016/17

2017/18

2018/19

 

 

Project

 

 

 

 

 

 

 

 

£000

£000

£000

£000

£000

 

 

 

 

 

 

 

 

 

 

SCOTTISH HOUSING QUALITY STANDARDS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Compliant with the tolerable standard

 

 

 

 

 

 

1.1

Major Repairs-

1,000

1,000

1,000

1,000

1,000

 

 

Roofs Renewal/Gutters/RWP/Roughcast

 

 

 

 

 

 

 

Undertaking large scale repairs to Roofs/Gutters/RWP/Roughcast

 

 

 

 

 

 

 

 

1,000

1,000

1,000

1,000

1,000

 

 

 

 

 

 

 

 

 

2

Free from Serious Disrepair

 

 

 

 

 

 

2.1

Primary Building Elements

 

 

 

 

 

 

 

Structural Repairs Multi Storey

7,380

8,400

3,416

1,859

2,000

 

 

Multi Storey blocks are surveyed on a 5-7 year cycle to identify any works required to the structure of the buildings in order to keep the buildings

 

 

 

 

 

 

 

safe and prolong their life.

 

 

 

 

 

 

 

Structural Repairs General Housing

3,000

2,000

1,500

1,500

1,500

 

 

Structural works carried out in order to keep the building stable and structurally sound.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Secondary Building Elements

 

 

 

 

 

 

2.2

Upgrading Of Flat Roofs General

350

350

300

300

250

 

 

Replacement of existing roof covering and upgrading of insulation to meet current building regulations.

 

 

 

 

 

 

2.3

Upgrade Flat Roofs Multi Storey

684

718

1,572

1,319

1,385

 

 

Full replacement of the flat roofs and also checking the replacement of roof ventilation as required

 

 

 

 

 

 

2.5

Mono Pitched Types

526

839

881

925

979

 

 

Replacement of the external render of the building, replacement of gutters and downpipes, environmental works

 

 

 

 

 

 

2.6

Window Replace General

1,251

480

2,638

2,720

1,249

 

 

A rolling programme of double glazing where previously single glazing, or replacing existing 

 

 

 

 

 

 

 

double glazing to meet current standards.  This is based on a cyclical programme.

 

 

 

 

 

 

2.7

Window Replace Multi Storey

0

0

0

0

0

 

 

A rolling programme to replace existing double glazing to meet current standards.  This is based on a cyclical programme.

 

 

 

 

 

 

2.8

Balcony Storm Doors

60

0

0

0

0

 

 

Replacement of existing doors with more secure, solid doors

 

 

 

 

 

 

2.9

Balcony Glass Renewal - Multi Storey

160

0

0

0

0

 

 

Replacement of existing balcony glazing on a cyclical basis

 

 

 

 

 

 

 

 

13,411

12,787

10,307

8,623

7,363

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2014/15

2015/16

2016/17

2017/18

2018/19

 

 

 

£000

£000

£000

£000

£000

 

3

Energy Efficient

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Effective insulation

 

 

 

 

 

 

3.1

Energy Efficiency – General Houses

100

100

100

100

100

 

3.2

General Houses Loft Insulation

 

 

 

 

 

 

 

Installation of loft insulation where there is none previously or the topping

165

196

185

231

185

 

 

up of existing insulation to comply with current building regulations.

 

 

 

 

 

 

 

Efficient Heating

 

 

 

 

 

 

3.3

Heating Systems Replacement

5,314

5,442

6,088

6,138

6,677

 

 

Replacement of boiler/whole system as deemed necessary.

 

 

 

 

 

 

3.4

Medical Need Heating

0

0

0

0

0

 

 

Installation of gas/electric heating depending on the medical assessment.

 

 

 

 

 

 

 

This can be installing a completely new system, modifying or extending an existing system.

 

 

 

 

 

 

3.5

Energy Efficiency Major Blocks

4,400

3,750

3,938

4,134

4,341

 

 

Contribution to Aberdeen Heat & Power for the creation of Combined Heat & Power Plants

 

 

 

 

 

 

3.6

Energy Efficiency Sheltered

350

250

250

200

200

 

 

Introduction of energy efficiency measures in extra care housing such as new or upgraded heating systems.

 

 

 

 

 

 

 

Additional Energy Efficiency measures

 

 

 

 

 

 

3.7

S.C.A.R.F

35

35

35

35

35

 

 

Payment to SCARF for work carried out by them under the Energy Efficiency programme to individual properties.  The work carried

 

 

 

 

 

 

 

out includes the installation of loft insulation, draught proofing and compact fluorescent bulbs.  Also providing tenants with energy efficiency advice and information.

 

 

 

 

 

 

3.8

Solid Wall Insulation

150

150

150

150

150

 

3.9

Vestibule Doors

0

0

0

0

0

 

 

 

10,514

9,923

10,746

10,988

11,688

 

 

 

 

 

 

 

 

 

4

Modern Facilities & Services

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bathroom and Kitchen Condition  

 

 

 

 

 

 

4.1

Modernisation Programme

9,728

2,006

1,120

1,691

838

 

 

Replacement of bathrooms and kitchens.

 

 

 

 

 

 

 

 

9,728

2,006

1,120

1,691

838

 

 

 

 

 

 

 

 

 

5

Healthy, Safe & Secure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Healthy

 

 

 

 

 

 

5.1

Condensation Measures

75

79

83

87

91

 

 

Installation of heating systems and ventilation measures to combat condensation.

 

 

 

 

 

 

 

 

Safe

 

 

 

 

 

 

 

5.3

Rewiring

1,548

2,906

2,284

1,674

1,906

 

 

Replacement of cabling, fittings and distribution boards as necessary. This work is carried out in every property on a cyclical basis

 

 

 

 

 

 

5.4

Lift Replacement Multi Storey/Major Blocks

600

724

761

799

839

 

 

Replacement of lifts where they are beyond economical repair. This can be full replacement or replacement of specific parts of the lift.

 

 

 

 

 

 

5.5

Smoke Detectors – Common Areas Major Blocks

54

170

159

125

131

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2014/15

2015/16

2016/17

2017/18

2018/19

 

 

 

£000

£000

£000

£000

£000

 

 

Healthy, Safe & Secure (continued)

 

 

 

 

 

 

5.6

Services

50

50

50

50

50

 

 

Cyclical maintenance/replacement of the following services

 

 

 

 

 

 

 

Ventilation Systems, water tanks/pipe work, refuse chutes/chamber, Dry risers systems, Standby Generators

 

 

 

 

 

 

5.7

Entrance Halls/Concierge

50

50

50

50

50

 

 

Provision of security service 

 

 

 

 

 

 

5.8

Laundry Facilities

52

50

50

50

50

 

 

Replacement of laundry equipment

 

 

 

 

 

 

5.9

Upgrading of Lighting

39

14

14

15

16

 

 

Installation of lighting controlled by photo cell i.e. switches on and off automatically depending on the level of natural light & installation of lighting in areas where there was none before

 

 

 

 

 

 

 

Secure

 

 

 

 

 

 

5.11

Door Entry Systems

48

42

44

46

49

 

 

Installation of door entry and replacement of existing doors where required

 

 

 

 

 

 

5.12

Replace Door Entry Systems - Major Blocks

48

50

53

56

58

 

 

Installation of door entry and replacement of existing doors where required

 

 

 

 

 

 

5.13

Other Initiatives

366

312

147

135

141

 

 

Upgrading of stairs and installation of security doors and door entry systems

 

 

 

 

 

 

 

 

2,930

4,447

3,695

3,087

3,381

 

 

 

 

 

 

 

 

 

 

NON SCOTTISH HOUSING QUALITY STANDARDS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

Community Plan & Single Outcome Agreement

 

 

 

 

 

 

6.1

Housing For Varying Needs

100

0

0

0

0

 

 

New build including extra care housing.

 

 

 

 

 

 

6.2

Community Initiatives

400

400

300

250

250

 

 

Refurbishment of properties or environmental improvements in designated areas.

 

 

 

 

 

 

6.5

Regeneration/Acquisition of Land or Houses

120

0

0

0

0

 

 

Early Action projects linked to Regeneration and Master planning Briefs for Regeneration.

 

 

 

 

 

 

 

 Acquisition of Land/Houses for the new build programme.

 

 

 

 

 

 

6.6

CCTV – Multi Storey

310

147

154

162

170

 

 

Provision of CCTV for the Multi Storey Service

 

 

 

 

 

 

6.7

Adaptations Disabled

1,250

1,250

1,000

1,000

1,000

 

 

Installation of level access showers, ramps, stair lifts and kitchen adaptations

 

 

 

 

 

 

6.8

Special Initiatives/Barrier Free Housing

150

150

150

150

150

 

 

Provision of specialist facilities or housing for tenants with particular needs i.e. extensions

 

 

 

 

 

 

6.9

Housing For Varying Needs- Amenity/Adaptations

300

75

75

75

75

 

 

Conversion of properties to Amenity Level standard

 

 

 

 

 

 

6.10

Housing For Varying Needs- Extra Care/Adaptations

430

75

75

75

75

 

 

Adaptations required to ensure existing sheltered housing stock meets current standards

 

 

 

 

 

 

6.11

Roads

100

100

100

100

100

 

 

Upgrade of Roads to an adoptable standard

 

 

 

 

 

 

6.12

Paths

100

100

100

100

100

 

 

Formation or upgrading of paths

 

 

 

 

 

 

6.13

Garages

0

0

0

0

0

 

 

Upgrade of Garages

 

 

 

 

 

 

6.14

New Affordable Housing

500

40

0

0

0

 

 

 

3,760

2,337

1,954

1,912

1,920

 

 

 

 

 

 

 

 

 

 

 

2014/15

2015/16

2016/17

2017/18

2018/19

 

 

 

£000

£000

£000

£000

£000

 

 

 

 

 

 

 

 

 

7

Service Development

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.1

Conditions Surveys

50

25

25

25

25

 

 

Surveying of Council houses to identify failures against Scottish Housing Quality Standard

 

 

 

 

 

 

7.2

Property Database

50

50

50

50

50

 

 

Various items of IT equipment including hardware and software

 

 

 

 

 

 

7.3

Integrated Housing System

75

75

75

50

50

 

 

Various purchase of PCs and software packages

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

175

150

150

125

125

 

 

 

 

 

 

 

 

 

9

Service Expenditure

 

 

 

 

 

 

 

Corporate Fees

5,405

4,424

3,961

3,756

3,599

 

 

 

5,405

4,424

3,961

3,756

3,599

 

 

 

 

 

 

 

 

 

 

Gross Programme

46,923

37,074

32,933

31,182

29,914

 

 

 

 

 

 

 

 

 

 

Less Slippage

(5,161)

(4,078)

(3,623)

(3,430)

(3,291)

 

 

 

 

 

 

 

 

 

 

Net Programme

41,762

32,996

29,310

27,752

26,623

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Financed by :-

 

 

 

 

 

 

 

Borrowing

 

19,303

10,863

6,313

3,252

0

 

 

CFCR

22,459

22,133

22,997

24,500

26,623

 

 

 

 

 

 

 

 

 

 

Total Funding

41,762

32,996

29,310

27,752

26,623

 

 

 

 

 

 

 

 

 

 

 

Councillor Delaney moved as an amendment, seconded by Councillor Greig:-

            That the Council -

(1)      approve the budget as attached in appendix 1 of the report;

(2)      agree to increase the weekly unrebated rents for municipal houses by 3.5%, to take effect from Monday 7 April 2014, noting that a rent increase of this level was compatible with the long term sustainability of the housing business plan;

(3)      approve a revenue contribution to the Housing Capital budget for 2014/15 of £21.924million, as well as a provisional contribution for the subsequent four financial years, as detailed in appendix 1 of the report;

(4)      agree to continue to increase the level of working balances to 10% to meet future contingencies;

(5)      agree to the continuation of the practice that all capital receipts, from the disposal of Council houses under right to buy, continue to be used to repay debt for 2014/15 and future years;

(6)      approve the level of miscellaneous rents and service charges, excluding Heat with Rent, as detailed in appendix 1 of the report;

(7)      instruct officers to report back to the Council Budget meeting on 6 February 2014 with recommendations on how the very substantial proposed increases in Heat with Rent might be mitigated;

(8)      agree a capital programme for the financial year 2014/15 of £41.762million based on the rent strategy adopted as well as the indicative level of programme for the financial years 2015/16 to 2018/19;

(9)      in order for work to commence on the capital programme, approve as estimated expenditure in terms of Standing Order 1(3) (of the Council’s Standing Orders relating to Contracts and Procurement) the sums shown against each heading of the Housing Capital budget set out in appendix 1 to the report; and

(10)   authorise the Director of Housing and Environment to undertake or instruct appropriate procedures to procure the works referred to in appendix 1 for the capital programme and award contracts relating thereto.

 

Councillor Jackie Dunbar advised that she had also prepared an amendment, however it was the same as the motion and therefore she was withdrawing it.

 

On a division, there voted:-

 

For the motion  (38)  -  Lord Provost; Depute Provost; and Councillors Allan, Blackman, Boulton, Cameron, Carle, Cooney, Corall, Cormie, Crockett, Dickson, Donnelly, Jackie Dunbar, Lesley Dunbar, Finlayson, Forsyth, Graham, Grant, Ironside, Jaffrey, Kiddie, Laing, Lawrence, MacGregor, McCaig, Malik, May, Milne, Jean Morrison, Nathan Morrison, Noble, Samarai, Sandy Stuart, Taylor, Thomson, Townson and Young.

 

For the amendment  (4)  -  Councillors Delaney, Greig, Malone and Yuill.

 

The Council resolved:-

to adopt the motion.