Former Tillydrone Infant School site, Coningham Gardens Aberdeen - 200206

Planning Reference – 200206/DPP

 

All documents associated with this application can be found at the following link and enter the reference number above:-

Link.

 

 

Planning Officer:  Aoife Murphy

Minutes:

 The Committee had before it a report by the Chief Officer – Strategic Place Planning, which recommended:-

 

That the application for detailed planning permission for the erection of a primary school with early years facility, associated 3G pitch, soft and hard landscaping, alterations to access and all associated works, at the former Tillydrone Infant School site, Coningham Gardens Aberdeen, be approved conditionally with upfront payment of the contribution and inter-service agreement.

 

Conditions

 

(1)             Materials

 

No works in connection with the development hereby approved shall commence unless details of the specification and colour of all the materials to be used in the external finish of the development have been submitted to and approved in writing by the planning authority. The development shall not be brought into use unless the external finish has been applied in accordance with the approved details, specification and colour.

 

Reason: In the interests of the appearance of the development and the visual amenities of the area.

 

(2)             Hours of Use

 

The All-Weather Sports Pitch hereby approved shall only be used (excluding maintenance) by the school or for pre-arranged lets to other persons during the period from 9am to 8pm on Mondays to Fridays and from 10am to 8pm on Saturdays and Sundays and shall not be used outwith these times by the school or by any other person for any purpose.

 

Reason: In order to ensure that the development would not result in undue loss of amenity for surrounding properties.

 

(3)             Noise

 

The building hereby approved shall not be brought into use unless a further assessment and report on the specific building services plant has been undertaken. This assessment and report shall then be submitted to and approved in writing by the planning authority in consultation with Environmental Health. Once approved, all mitigation measures recommended in the report should be implemented prior to the building being brought into use and retained in perpetuity.

 

Reason: To ensure that noise from the use of the development does not result in undue loss of

amenity for surrounding properties.

 

(4)             Odour

 

The building hereby approved shall not be brought into use unless an odour impact assessment has been undertaken once the kitchen design has been established. This assessment shall then be submitted to and approved in writing by the planning authority in consultation with Environmental Health. Once approved, all mitigation measures recommended in the report shall be implemented prior to the building being brought into use and retained in perpetuity.

 

Reason: To ensure that odour from the use of the development does not result in undue loss of

amenity for surrounding properties.

 

(5)             Lighting Strategy

 

The development hereby approved shall not be brought into use unless full details of the proposed lighting for the development and an impact assessment of obtrusive light from the development have been submitted to and approved in writing by the planning authority. Prior to the assessment being undertaken in accordance with a scope that has been agreed with the planning authority in consultation with Environmental Health. All lighting shall be provided and thereafter retained in perpetuity in accordance both with the approved scheme and the Guidance Notes for the Reduction of Obtrusive Light issued by the Institution of Lighting Professionals (GN01:2011) and any such guidance notes that replace or supersede them.

 

Reason: In order to minimise the amount of obtrusive lighting from the development in the interests of the residential and visual amenity of the surrounding area.

 

(6)             Traffic Restrictions

 

The building hereby approved shall not be brought into use unless the existing traffic management signage within the surrounding road network have been implemented. The extent of the works shall be agreed with the Council’s Traffic Management Team.

 

Reason: In the interests of road safety and providing a safe route to school.

 

(7)             Travel Plan

 

The development hereby approved shall not be brought into use unless a Travel Plan for that building has been submitted to and approved in writing by the planning authority. The Travel Plan shall encourage more sustainable means of travel and shall include mode share targets. It shall identify measures to be implemented, the system of management monitoring review, reporting and duration of the incorporated measures designed to encourage modes other than the private car. The building shall not be brought into use unless the measures set out in its approved Travel Plan have been implemented in full.

 

Reason: In the interests of encouraging a more sustainable means of travel to and from the

proposed development.

 

(8)             Foul and Surface Water Drainage Arrangements

 

The building hereby approved shall not be brought into use unless the proposed foul and surface water drainage arrangements have been provided in accordance with the approved plans and the Drainage Assessment, prepared by Fairhurst, dated March 2019 (project reference 132043). The foul and surface water drainage arrangements shall be permanently retained thereafter in accordance with the approved maintenance scheme contained within the Drainage Strategy.

 

Reason: In order to ensure that adequate drainage facilities are provided, and retained, in the

interests of the amenity of the area.

 

(9)             Bird Management

 

Development shall not commence until a Bird Hazard Management Plan has been submitted to and approved in writing by the planning authority in consultation with Aberdeen Airport. The submitted plan shall include details of:  Management of any flat/shallow pitched roofs (of less than 15 degrees) on buildings within the site which may be attractive to nesting, roosting and “loafing” birds. The management plan shall comply with Advice Note 8 ‘Potential Bird Hazards from Building Design’ and any such guidance notes that replace or supersede them.  The Bird Hazard Management Plan shall be implemented as approved, on completion of the development and shall remain in force for the life of the building. No subsequent alterations to the plan are to take place unless they have been submitted to, and approved in writing by, the planning authority in consultation with Aberdeen Airport.

 

Reason: It is necessary to manage the development in order to minimise its attractiveness to birds which could endanger the safe movement of aircraft and the operation of Aberdeen Airport.

 

(10)         Landscaping Scheme

 

No works in connection with the development hereby approved shall commence unless a scheme of hard and soft landscaping works has been submitted to and approved in writing by the planning authority.

Details of the scheme shall include:

a)     Existing and proposed finished levels.

b)     The location of re-planted trees or compensatory planting.

c)     The location of new trees, shrubs, hedges and grassed areas.

d)     A schedule of planting to comprise species, plant sizes and proposed numbers and density.

e)     The location, design and materials of all hard landscaping works including walls, fences, gates, and play equipment.

f)       An indication of existing trees, shrubs and hedges to be removed.

g)     A programme for the implementation, completion and subsequent management of the proposed landscaping.

All soft and hard landscaping proposals shall be carried out in accordance with the approved planting scheme and management programme. Any planting which, within a period of 5 years from the completion of the development, in the opinion of the planning authority is dying, being severely damaged or becoming seriously diseased, shall be replaced by plants of similar size and species to those originally required to be planted. Once provided, all hard landscaping works shall thereafter be permanently retained.

 

Reason: To ensure the implementation and management of a satisfactory scheme of landscaping which will help to integrate the proposed development into the local landscape in the interests of the visual amenity of the area.

 

(11)         Tree Protection

 

No works in connection with the development hereby approved shall commence unless the tree protection measures have been implemented in full in accordance with the approved tree protection plan, plan reference TPS-2002-TP. No materials, supplies, plant, machinery, soil heaps, changes in ground levels or construction activities shall be permitted within the protected areas without the written consent of the planning authority and no fire shall be lit in the position where the flames could extend to within 5 metres of foliage, branches or trunks. The approved tree protection measures shall be retained in situ until the development has been completed.

 

Reason: In order to ensure adequate protection for the trees and hedges on the site during the

construction of development, and in the interests of the visual amenity of the area.

 

(12)         Environmental Enhancements

 

No works in connection with the development hereby approved shall commence unless a scheme of environmental enhancements has been submitted to and approved in writing by the planning authority in consultation with the Scottish Environmental Protection Agency. Once approved the scheme shall be implemented in full.

 

Reason: To ensure the offset of environmental impacts and contribute to and enhance the natural environment and support Policy D1 – Quality Placemaking by Design.

 

(13)         Site Investigation

 

No development shall take place unless it is carried out in full accordance with a scheme to address any significant risks from contamination on the site which has been submitted to and approved in writing by the planning authority.  The scheme shall follow the procedures outlined in “Planning Advice Note 33 Development of Contaminated Land” and shall be conducted by a suitably qualified person in accordance with best practice as detailed in “BS10175 Investigation of Potentially Contaminated Sites - Code of Practice” and other best practice guidance and shall include:

1. An investigation to determine the nature and extent of contamination

2. A site-specific risk assessment

3. A remediation plan to address any significant risks and ensure the site is fit for the use proposed

4. Verification protocols to demonstrate compliance with the remediation plan

 

Reason: In order to ensure any potential contamination of the site is dealt with appropriately in the interests of public and environmental safety.

 

(14)         Scheme of Remediation

 

No building on the development site shall be brought into use unless:

1. Any long-term monitoring and reporting that may be required by the approved scheme of contamination or remediation plan, or that otherwise has been required by the planning authority in writing, is being undertaken; and

 

2. A report specifically relating to the building has been submitted and approved in writing by the planning authority that verifies that remedial works to fully address contamination issues related to the building have been carried out, unless the planning authority has given written consent for a variation.

 

The building on the application site shall not be brought into use unless a report has been submitted to and approved in writing by the planning authority that verifies that the remedial works have been carried out in full accordance with the remediation plan.

 

Reason: To ensure that the site and its buildings are suitable and fit for use by humans, and is free of contamination, or hazardous substances for human beings.

 

(15)         Carbon Neutrality and Water Efficiency

 

No building hereby approved shall be erected unless an Energy Statement and Water Efficiency applicable to that building has been submitted to and approved in writing by the planning authority.  The Energy Statement shall include the following items:

a)     Full details of the proposed energy efficiency measures and/or renewable technologies to be incorporated into the development;

b)     Calculations using the SAP or SBEM methods which demonstrate that the reduction in carbon dioxide emissions rates for the development, arising from the measures proposed, will enable the development to comply with Policy R7 of the Aberdeen Local Development Plan 2017.  The Water Efficiency Statement shall include details of all proposed water saving technologies and techniques.  The development shall not be brought into use unless it has been constructed in full accordance with the approved details in both statements. All measures shall be retained in place and fully operational thereafter.

 

Reason: to ensure this development complies with the on-site carbon reductions required in Scottish Planning Policy and Policy R7 of the Aberdeen Local Development Plan 2017.

 

The Committee heard from Aoife Murphy, Senior Planner, who spoke in furtherance of the application and answered questions from members.

 

The Committee resolved:-

to approve the application as contained in the report. 

 